Difference between revisions of "POC-Battery"

From ESS-WIKI
Jump to: navigation, search
Line 3: Line 3:
 
<span style="font-size:medium;">POC Battery&nbsp;System&nbsp;implements easily complete supervisory POC battery capacity and charging status.</span>
 
<span style="font-size:medium;">POC Battery&nbsp;System&nbsp;implements easily complete supervisory POC battery capacity and charging status.</span>
  
<br/>
+
 
  
 
= System Architecture =
 
= System Architecture =
Line 9: Line 9:
 
[[File:Poc-battery-architecture.png|800x480px|Poc-battery-architecture.png]]
 
[[File:Poc-battery-architecture.png|800x480px|Poc-battery-architecture.png]]
  
<br/>
+
 
  
 
= How to =
 
= How to =
Line 29: Line 29:
 
<span style="font-size:medium;">Double click POC-IPSM90-1.0.x.exe to start POC-IPSM90 client application installation.</span>
 
<span style="font-size:medium;">Double click POC-IPSM90-1.0.x.exe to start POC-IPSM90 client application installation.</span>
  
<br/>
+
 
  
 
== Configuration ==
 
== Configuration ==
Line 40: Line 40:
  
 
<span style="font-size:medium;">Double&nbsp;click on desktop's shortcut POC-IPSM90&nbsp;icon to&nbsp;launch the program.</span>
 
<span style="font-size:medium;">Double&nbsp;click on desktop's shortcut POC-IPSM90&nbsp;icon to&nbsp;launch the program.</span>
 +
 +
<br/>
 +
<br/>
  
 
= QA Test Cover =
 
= QA Test Cover =
Line 49: Line 52:
 
<span style="font-size:medium;">• Alarm Setting / Notify…</span>
 
<span style="font-size:medium;">• Alarm Setting / Notify…</span>
  
<br/>
+
 
  
 
== Abnormal Test ==
 
== Abnormal Test ==
Line 59: Line 62:
 
<span style="font-size:medium;">• EdgeX shutdown …</span>
 
<span style="font-size:medium;">• EdgeX shutdown …</span>
  
<br/>
+
 
  
 
== Reliability Test ==
 
== Reliability Test ==
Line 67: Line 70:
 
<span style="font-size:medium;">• System Resources</span>
 
<span style="font-size:medium;">• System Resources</span>
  
<br/>
+
 
  
 
= Release =
 
= Release =

Revision as of 08:54, 17 June 2019

Introduction

POC Battery System implements easily complete supervisory POC battery capacity and charging status.


System Architecture

Poc-battery-architecture.png


How to

Prerequisites

- EdgeX for IPSM90

- WISEAgent

- MQTT Broker

Installation

Install EdgeX for IPSM90 Packages (Docker & API)

Double click MQTTBrokerSetup_1.0.3.exe to start MQTT Broker installation.

Double click POC-IPSM90-1.0.x.exe to start POC-IPSM90 client application installation.


Configuration

N.A.


Start Program

Double click on desktop's shortcut POC-IPSM90 icon to launch the program.



QA Test Cover

Functional Test ( Server / Client )

• Battery / Average Info

• Alarm Setting / Notify…


Abnormal Test

• Battery hot plug

• Power-Off

• EdgeX shutdown …


Reliability Test

• Long-Term

• System Resources


Release

This is an overview that displays POC Battery Applivation versions and some stats and numbers for each release.

Index Version Date Platform OS Release Note

Installer 

1 v1.0.1 2019/05/31 x86_64 CPU
Windows  

POC-Battery Release Note v1.0.1 RC1

Above files are available at local server, please paste file's url in File Explorer to copy file.


 POC-Battery Installer v1.0.1 RC1

Above files are available at local server, please paste file's url in File Explorer to copy file.