AFE-R761 GMSL/AHD board Installation

From ESS-WIKI
Jump to: navigation, search

1.Remove the bottom cover.
2. Remove 6 x M3x6L screws on the bottom cover and 8 x M3x4L screws on the side I/O brackets.
3. Install AHD/GMSL board (AFE-RM01/AFE-RM02) via CN1 connector.
4. Fix board with 5 x M3x6L screws and 5 x Posts (F=M3x8L M=M3x4L B=5 H=25mm).
5. Re-place the I/O bracket and bottom cover.

AFE-R761 GMSL AHD board.jpg